Designing a foundation and cladding wall (12'-0" tall, 8" masonry) and the metal building types want it cantilevered, not providing a girt for the top.
Question I have, would it be better to do 1 row of rebar in the center, say #7, or two rows of #5? What about a single row out of the footing, and then transition to 2 rows?
Just trying to make it easy to build, im sure the contractor will mess up 2 rows out of the footing.
Question I have, would it be better to do 1 row of rebar in the center, say #7, or two rows of #5? What about a single row out of the footing, and then transition to 2 rows?