cluelessinohio
Mechanical
- Oct 23, 2003
- 5
Has anyone applied and successfully received the point for Leed EQ Credit 7.1 Thermal Comfort in a large facility which is mainly sheet metal welding and part assembly?
Typical facilities do not need to be cooled to office conditions but tempered 5 to 10 degrees below ambient outside conditions with no humidity control.
How does ASHRAE 55 apply to this type of facility?
Typical facilities do not need to be cooled to office conditions but tempered 5 to 10 degrees below ambient outside conditions with no humidity control.
How does ASHRAE 55 apply to this type of facility?