I am looking for a simple answer to a non-simple question.
My cooling load program requires an entry for CFM/SF for infiltration. Building in question is a corrugated steel siding, and visual inspection shows it to be not so tight.
0.1 CFM/SF, maybe higher?
Thanks
PacificSteve