HienN
Electrical
- Jul 20, 2009
- 48
Dear all,
According to customer request, we need to increase our production volume of GN (1800Nm3/h) up to (2500Nm3/h)in an on-site plant. This plant was designed to work with the 1800Nm3/h flow.
How we can modify the system to adapt this new change?
We have 02 back-up tanks (2x50.000liters) and 02 vaporizers (2x1700Nm3/h). GN is supplied to customer via one piping system with metering system at the connection point.
We can change the pipe sizes. But the specification of the plant is fixed.
According to customer request, we need to increase our production volume of GN (1800Nm3/h) up to (2500Nm3/h)in an on-site plant. This plant was designed to work with the 1800Nm3/h flow.
How we can modify the system to adapt this new change?
We have 02 back-up tanks (2x50.000liters) and 02 vaporizers (2x1700Nm3/h). GN is supplied to customer via one piping system with metering system at the connection point.
We can change the pipe sizes. But the specification of the plant is fixed.