Dear friends,
i facing one problem.I gave a job to sub-vendor,to make a spool for low temprature service(operating temp.-9 degree C).The sub vendor completed the job with already qualified WPS & PQR of material A333 with impact test temperature at -20 degree C.But our client requirement is A333 Gr.6,its imapct test requirement temperature is -45 degree C as per standard.
Now,is the spool is acceptable depon as per operating temp.-9 degree C.can i move futher to approach my client regarding the acceptance ofthis spool
i facing one problem.I gave a job to sub-vendor,to make a spool for low temprature service(operating temp.-9 degree C).The sub vendor completed the job with already qualified WPS & PQR of material A333 with impact test temperature at -20 degree C.But our client requirement is A333 Gr.6,its imapct test requirement temperature is -45 degree C as per standard.
Now,is the spool is acceptable depon as per operating temp.-9 degree C.can i move futher to approach my client regarding the acceptance ofthis spool