Where I am column joints are at floor level, not at midheight.
Seismic codes require that length of lap splices when column are joined at floor level be 1.5 times the basic anchorage length, as a punishment.
I have a situation where available starters are a ft short, satisfy basic anchorage length but not the 1.5 times increase.
What can be done to correct this situation without welding extra length to the existing short starters?