mitchk
Industrial
- Aug 24, 2011
- 2
I have a gear with a tapered bore that will be pressed onto the mating part (shaft). The centerline of the tapered bore is the primary datum. How is the proper way to dimension this on my drawing?
Thanks!
Mitch Komarmy
Quality Lab Manager
ZF Wind Power LLC
Thanks!
Mitch Komarmy
Quality Lab Manager
ZF Wind Power LLC