Galambos
Structural
- Jun 27, 2005
- 231
Is there any reason that the attached connection cannot develop the full capacity (ACI) of the deformed bar anchors located at the edge of the slab?
I have met the hook development length and spacing requirements. My slab has the flexural and shear capacity from a slab analysis standpoint.
I will be adding hair pin ties around the hooks in accordance with 12.5.3.
Could there be something I am not thinking of that would limit the capacity of the DBA's to take the full tension?
Thanks ahead of time.