Greetings!
I am working at a 1223 MW CCPP installed with 2 x GE H class gas turbines and 1 x Alstom triple pressure steam turbine. We are having a shutdown these days and got a chance to go inside the condenser or LP turbine exhaust section. There, we saw an open flange at either side of the LP turbine after its final stage and before de-superheating nozzles manifold. That open flange is associated to a line that is going vertically in the upward direction but it cant be traced because of space issue.
I have checked the cross sectional diagram of the steam turbine and according to my knowledge both of the above mentioned flanges are shown there ( attached please find the drawing) .
Can anyone please help me and my follows in understanding the purpose of these two lines ending on open flanges? any help in this regard will be very beneficial
link to the diagram ( )
thanks in advance
I am working at a 1223 MW CCPP installed with 2 x GE H class gas turbines and 1 x Alstom triple pressure steam turbine. We are having a shutdown these days and got a chance to go inside the condenser or LP turbine exhaust section. There, we saw an open flange at either side of the LP turbine after its final stage and before de-superheating nozzles manifold. That open flange is associated to a line that is going vertically in the upward direction but it cant be traced because of space issue.
I have checked the cross sectional diagram of the steam turbine and according to my knowledge both of the above mentioned flanges are shown there ( attached please find the drawing) .
Can anyone please help me and my follows in understanding the purpose of these two lines ending on open flanges? any help in this regard will be very beneficial
link to the diagram ( )
thanks in advance