Thanks for your replies. Yes, jdmm, that is the process. Was the settlement your concern, and was the process done? If the electrical resistive heating process was done, can you share foundation and floor slab response information? The site I am analyzing as a geotechnical consultant is clayey glacial till. A recharge of water for cooling the anode (or cathode) and infiltration into the soils is proposed as part of the heating and vacuum treatment. I have my opinions and calculations, but was hoping to raise some independant and non-site-specific thought. Of course, time is running out.