Does the Uniform Building Code, which we understand is the standard for construction, require a residential Post Tension Foundation be constructed from a signed, sealed, engineered design for a particular structure?
Should there be soil samples for a site preparation plan?
Should there be inspections pre-pour and post-pour?
Are there any other requirements of the UBC for residential Post Tension foundations?
Should the cable supplier have an engineered plan to view, in order to deliver the correct materials to the jobsite?
Does the Post Tension Institute in Phoenix have any requirements, or do they just offer guidelines?
Thank you in advance.
Should there be soil samples for a site preparation plan?
Should there be inspections pre-pour and post-pour?
Are there any other requirements of the UBC for residential Post Tension foundations?
Should the cable supplier have an engineered plan to view, in order to deliver the correct materials to the jobsite?
Does the Post Tension Institute in Phoenix have any requirements, or do they just offer guidelines?
Thank you in advance.