JoeBaseplate
Structural
- May 31, 2011
- 204
Please see the attached sketch for a visual explanation of the situation. And as the title suggest, one of the edges of the proposed elevator pit are right underneath an existing footing. The footing is 4’ square. I think this preliminary detail should be fine, except I am not sure about the underpinning and its consequences on the existing footing. Since they will have to over excavate the area under the footing to place the wall, how would the contractor be able to place a compacted fill under the footing. Would a lean concrete mix be a better option?