OSUCivlEng
Civil/Environmental
I am designing a 3 span concrete slab span bridge with a 30-40-30 span configuration. The effective strip width, E, is based on the span length. So my question is should I use the smaller E from the end spans for the center span as well? Or just use a different effective strip width for the center and end spans?