MikeMontgomery
Computer
- Jun 26, 2007
- 2
A change in requirements caused a vessel to be re Tagged. There has been some discussion as to whether or not this constitutes an engineering change. My feeling is that it is a drawing change and the revision is for the drawing regardless of the content. So, any change to the drawing requires an up rev.
My colleague contends that up revving the drawing implies an engineering change. If I follow that line of logic then the drawing should be up revved anyway because the tag number appears on "other documents and systems".
Unfortunately, I cannot find any standards or contract requirements to resolve this.
My colleague contends that up revving the drawing implies an engineering change. If I follow that line of logic then the drawing should be up revved anyway because the tag number appears on "other documents and systems".
Unfortunately, I cannot find any standards or contract requirements to resolve this.