fivestring
Civil/Environmental
- Mar 30, 2007
- 24
I am working on an erosion control plan for construction within a national forest. It would seem that at some point silt would dissipate before reaching a creek or stream if it is a certain distance from the construction. Could there be a rule of thumb based on the distance, slope and condition of native ground, and maybe soil type in which silt fence would not be needed?