Pavel Z.
Mechanical
- Feb 2, 2019
- 1
Hello everybody,
I would like to ask you for your tips. Our company is currently designing automatical machine which has to check if the screw is bended or not. Based on the results and tolerances the screws have to be sorted out onto the OK or NOK conveyor. At this device we should also check screw head with the Keyence camera because of possible scratch (damage). The machine should be as simple as possible to avoid the failures and of course as fast as possible
Our current proposal is:
1. Feeding of screws and orientation into the vertical position is solved.
2. Transfer of screws by vibrating conveyor
3. Inspection station as you can see in the attached video ( Bending is checked by Keyence MEasurement System (screw has to be rotated - 720°). Above installed camera is checking the screw head.
4. After the inspection are the screws transfered on the slide into the conveyor intended for OK/NOK parts.
Inspected screws: 140-500mm / Diameter 6, 8 and 10mm
If any opinion, design improvement tips or improvement tips how to speed up the cycle I´ll be very happy![[glasses] [glasses] [glasses]](/data/assets/smilies/glasses.gif)
Thank you guys.
Best Regards
Pavel Z.
I would like to ask you for your tips. Our company is currently designing automatical machine which has to check if the screw is bended or not. Based on the results and tolerances the screws have to be sorted out onto the OK or NOK conveyor. At this device we should also check screw head with the Keyence camera because of possible scratch (damage). The machine should be as simple as possible to avoid the failures and of course as fast as possible
1. Feeding of screws and orientation into the vertical position is solved.
2. Transfer of screws by vibrating conveyor
3. Inspection station as you can see in the attached video ( Bending is checked by Keyence MEasurement System (screw has to be rotated - 720°). Above installed camera is checking the screw head.
4. After the inspection are the screws transfered on the slide into the conveyor intended for OK/NOK parts.
Inspected screws: 140-500mm / Diameter 6, 8 and 10mm
If any opinion, design improvement tips or improvement tips how to speed up the cycle I´ll be very happy
![[glasses] [glasses] [glasses]](/data/assets/smilies/glasses.gif)
Thank you guys.
Best Regards
Pavel Z.