Even if I did support shear friction theory, this is not it, as the bars are not developed into the piles. I wonder how you arrived at 33 kN per N16 dowel. Dowel action has very little to do with the strength of the bar, but rather bearing in the concrete, and that methodology is not well codified. Like jayrod12, if there is enough key depth, I would be happy, but 50 mm would be my minimum, and it doesn't look like you have that much. The spoon drain is also worrisome, as hydraulic engineers and concrete finishers can create havoc with your depth.