dlamoure
Structural
- Apr 7, 2006
- 2
I am checking the design of a temporary roof structure and am having trouble getting the design to perform against uplift. I have problems in both the capacity of my connections as well as simply not having enough dead load to resist the applied uplift forces.
I believe I will be able to make the numbers work by going to a shorter MRI and possibly a lower importance factor based on the fact that this is a short term installation (covered deck for a construction office trailer), however I get completely blown out of the water when I consider the load combination of 0.6D + W.
My question is this: Is it necessary to apply the 0.6 factor to my dead load when my only DL is the self weight of the structure? I can understand taking a reduction in DL if I had a higher degree of uncertainty in my loads (such as superimposed dead loads) but in this case I have a high level of confidence in my dead load as I am only considering the self weight of the actual structure. Is there any case when it would not be necessary to consider the 0.6 reduction factor?
I believe I will be able to make the numbers work by going to a shorter MRI and possibly a lower importance factor based on the fact that this is a short term installation (covered deck for a construction office trailer), however I get completely blown out of the water when I consider the load combination of 0.6D + W.
My question is this: Is it necessary to apply the 0.6 factor to my dead load when my only DL is the self weight of the structure? I can understand taking a reduction in DL if I had a higher degree of uncertainty in my loads (such as superimposed dead loads) but in this case I have a high level of confidence in my dead load as I am only considering the self weight of the actual structure. Is there any case when it would not be necessary to consider the 0.6 reduction factor?