Hello All,
I was wondering if it is possible to create a custom task within task scheduler to take all the latest revisions of drawings that are in the PDM works vault and generate a PDF of each drawing. It would even be a bonus to have the PDF be attached to the drawing. If this is possible where do I start? I am not very familiar with the task scheduler.
Best Regards,
Jon
Challenges are what makes life interesting; overcoming them is what makes life meaningful.
Solidworks 2006 SP0.0
I was wondering if it is possible to create a custom task within task scheduler to take all the latest revisions of drawings that are in the PDM works vault and generate a PDF of each drawing. It would even be a bonus to have the PDF be attached to the drawing. If this is possible where do I start? I am not very familiar with the task scheduler.
Best Regards,
Jon