What do you want to do with this feed? What components you want to separate. First decide on the objectives. Here are some steps:
1. Dry the gas - moisture removal using silica gel or mol seives
2. Remove arsenic or mercury, if present
3. Remove acid gases - H2S etc - (Amine treating?)
4. Remove heavy hydro-carbons for dew-point requirements
5. remove c2,C3,C4 before sending the NG to end user, if there is economical benefit of removing them at source.
6. Cool and compress to LNG fo shipping to remote users OR simply compress and send-out through pipelines for users nearby.
After freezing the overall process-flow, identify each equipment- column, flash vessel, HE, pump etc- and cost for each component/system. Include costs for civil work, equipment erection, piping work, instrumentation and control system and electrical components. . . .
Break-down the entire system in to simple components and cost.
Hope this broad view is of some use.
KRECian