cive316
Civil/Environmental
- Dec 1, 2015
- 2
Relatively fresh engineer/inspector here. Currently on my second job with pile driving. Looking for any advice/tips that others use to set a "datum" to measure blows per foot by. On my previous job I would mark 1' increments on the pile and then put a mark on the leads and use that as my reference (hope that makes sense). That worked fine but sometimes the leads would move or shift or the pile would spin slightly (shell pile) and my marked "datum" wouldn't be visible with the 1' markings on the pile. Any other ideas? Thanks.