kingnero
Mechanical
- Aug 15, 2009
- 1,779
I like to use four bolts for setting a heavy workbench level.
For this I would need four pieces of steel, drilled and tapped for the bolts, welded on the bottom of the feet.
Can I use (100% of) the yield stress for this (for the grade of bolt I'm using), or would this not be correct?
Now that I think of it, I've never calculated a bolt for compression. Not even a set screw.
Also, what would an appropriate factor of safety be?
I appreciate your input...
For this I would need four pieces of steel, drilled and tapped for the bolts, welded on the bottom of the feet.
Can I use (100% of) the yield stress for this (for the grade of bolt I'm using), or would this not be correct?
Now that I think of it, I've never calculated a bolt for compression. Not even a set screw.
Also, what would an appropriate factor of safety be?
I appreciate your input...