Hey all you fellow number crunchers,
I've got to do a preliminary evaluation to determine what measures will be necessary to put a restaurant on the second floor of a ~1900 bldg. Anybody have any idea of a uniformly distributed equipment dead load? It will be a typical 4-star restaurant kitchen with gobs of stainless steel, ovens, walk-in cooler, ranges, prep tables, etc. The dining area is ~1400 sf so its not going to be a very large volume/flow kitchen. I was thinking in the 100 psf range but really don't have a good feel for this. Any help would be appreciated.
Also, ASCE 7 in table C4-1 gives a minimum live load of 150 psf for non-domestic kitchens. The building code official stated a 65 psf live load for this kitchen. Does ASCE's live load include equipment? I thought kitchen type equipment would be considered dead load....
I've got to do a preliminary evaluation to determine what measures will be necessary to put a restaurant on the second floor of a ~1900 bldg. Anybody have any idea of a uniformly distributed equipment dead load? It will be a typical 4-star restaurant kitchen with gobs of stainless steel, ovens, walk-in cooler, ranges, prep tables, etc. The dining area is ~1400 sf so its not going to be a very large volume/flow kitchen. I was thinking in the 100 psf range but really don't have a good feel for this. Any help would be appreciated.
Also, ASCE 7 in table C4-1 gives a minimum live load of 150 psf for non-domestic kitchens. The building code official stated a 65 psf live load for this kitchen. Does ASCE's live load include equipment? I thought kitchen type equipment would be considered dead load....