I'm currently working on a building which is primarily PT slab and RC column construction. It is 6 stories and the roof is structural steel. The exterior walls contain mansard roofs that start to come back into the room at 3' from the floor.
The structure of the mansard is framed by welding a W8 vertical member that sits on a baseplate to a stub column to a W8 member at approximately 40 degrees to a W14 horizontal member that is actually supporting the beams that the roof structure sits on. I know it sounds complicated, and I've included a link where you can see the image of a typical framing condition.
There are concrete columns that extend 2'6" above the 6th floor. They are typically 24" wide and 14" deep. There are 31 columns that we've surveyed and 13 of them have failed. There is a large crack that splits the column and most of the members on top of the columns have kicked out up to 1". After scanning for steel, we found only vertical bars and no ties, we believe this is ultimately the reason they have failed. The loads found in RISA are about 11 kips. These baseplates land at the back corner of the column top, and back center of the column tops.
We have to detail a fix for this poorly thought out connection. I was thinking of welding a member on the angled W8 and bring it straight down to the front face of the concrete column and attach there.
I'm sorry if this is very confusing but I'm trying to look for some direction here. Any ideas? Can I clarify anything for you? Please feel free to critisize my description.
Thanks a bunch guys
RC
All that is necessary for the triumph of evil is that good men do nothing.
Edmund Burke
The structure of the mansard is framed by welding a W8 vertical member that sits on a baseplate to a stub column to a W8 member at approximately 40 degrees to a W14 horizontal member that is actually supporting the beams that the roof structure sits on. I know it sounds complicated, and I've included a link where you can see the image of a typical framing condition.
There are concrete columns that extend 2'6" above the 6th floor. They are typically 24" wide and 14" deep. There are 31 columns that we've surveyed and 13 of them have failed. There is a large crack that splits the column and most of the members on top of the columns have kicked out up to 1". After scanning for steel, we found only vertical bars and no ties, we believe this is ultimately the reason they have failed. The loads found in RISA are about 11 kips. These baseplates land at the back corner of the column top, and back center of the column tops.
We have to detail a fix for this poorly thought out connection. I was thinking of welding a member on the angled W8 and bring it straight down to the front face of the concrete column and attach there.
I'm sorry if this is very confusing but I'm trying to look for some direction here. Any ideas? Can I clarify anything for you? Please feel free to critisize my description.
Thanks a bunch guys
RC
All that is necessary for the triumph of evil is that good men do nothing.
Edmund Burke