Are there any specific things to watch out for when designing a 10' deep masonry wall/beam cantilevering out 6' picking up 44 kips at the end?
We have an odd situation where a building's facade sticks out and one of the ideas was to extend an already existing masonry wall and use it as a deep beam rather than pour concrete. The facade is used to hide rooftop equipment and the back walls form the equipment room.
I am designing reinforcing bars to carry all the shear and fully grouting the wall. How far beyond the cantilever should I extend my full grouted cells?
We are Virginia Tech
Go HOKIES
Are there any specific things to watch out for when designing a 10' deep masonry wall/beam cantilevering out 6' picking up 44 kips at the end?
We have an odd situation where a building's facade sticks out and one of the ideas was to extend an already existing masonry wall and use it as a deep beam rather than pour concrete. The facade is used to hide rooftop equipment and the back walls form the equipment room.
I am designing reinforcing bars to carry all the shear and fully grouting the wall. How far beyond the cantilever should I extend my full grouted cells?
We are Virginia Tech
Go HOKIES