We have a pressurized calibration loop where we want to reduce cost for spool sections. We want to be in compliance with B31.3 generally.
As we need to have inner diameter to a certain dimensions (8" sch 40), we can get 2 or 3mm plate rolled to this ID.
To be in compliance with B31.3, do we need to complete xray etc.. or as this is for internal use, would SEP be sufficient & a final hydro test be sufficient?
As we need to have inner diameter to a certain dimensions (8" sch 40), we can get 2 or 3mm plate rolled to this ID.
To be in compliance with B31.3, do we need to complete xray etc.. or as this is for internal use, would SEP be sufficient & a final hydro test be sufficient?