10815L
Chemical
- Jul 24, 2011
- 178
Hi all,
we are in discussion for production pipeline, connecting from well to production header and total length is 4 Km, High pressure 700 psig.
safety point of view buried piping is ok and cost point of view above ground piping is ok but i would like to konw what is best option for production piping bring to the production header. Dear experts please share your exeprience.
Thanks
10815l
we are in discussion for production pipeline, connecting from well to production header and total length is 4 Km, High pressure 700 psig.
safety point of view buried piping is ok and cost point of view above ground piping is ok but i would like to konw what is best option for production piping bring to the production header. Dear experts please share your exeprience.
Thanks
10815l