Apr 2, 2011 #1 mectub Mechanical Joined Mar 4, 2009 Messages 22 Location VE Hello everyone i'm doing an stress analysis using HYD case.I would like to know why a piping system do code stress check and the other dont. Both using B31.3 and same HP. Thanks for your help
Hello everyone i'm doing an stress analysis using HYD case.I would like to know why a piping system do code stress check and the other dont. Both using B31.3 and same HP. Thanks for your help
Apr 3, 2011 1 #2 richay Mechanical Joined Apr 17, 2000 Messages 246 Location US Is Sy specified for both input files? Richard Ay Intergraph CAS Upvote 0 Downvote
Apr 4, 2011 Thread starter #3 mectub Mechanical Joined Mar 4, 2009 Messages 22 Location VE No, none of them has been specified. Upvote 0 Downvote
Apr 7, 2011 #4 richay Mechanical Joined Apr 17, 2000 Messages 246 Location US Sy is required for the "hydrotest" allowable. Richard Ay Intergraph CAS Upvote 0 Downvote