AWS D1.1 requires a visual examination and volumetric NDT prior to performing the mechanical tests. The AWS D1.1 acceptance criteria for VT, bend tests, and NDT are more stringent than ASME Section IX. The essential variables that must be recorded for AWS D1.1 are more extensive and restrictive than ASME Section IX. In other words, a PQR per ASME Section IX does not meet the requirements of AWS D1.1.
The Engineer of Record can accept a PQR done in accordance with a different welding standard in support of a WPS for AWS work, but I find most of those engineers that do accept ASME documentation are unfamiliar with the differences between the two welding standards, i.e., ASME and AWS.
Best regards - Al