I have a condition where a 1/4" fillet weld has already been made. Now, a 5/16" fillet weld is required. Is it acceptable to just ad the additional 1/16" of weld?
I have a condition where a 1/4" fillet weld has already been made. Now, a 5/16" fillet weld is required. Is it acceptable to just ad the additional 1/16" of weld?