We have received the order from our client to supply Drilling (Wellhead) Equipment and the required certification is 3.2 and third party inspection (TPI: client appointed).
But, our supplier/manufacturer is saying that they will use the “off the shelf raw material with EN 10204 3.1 Mill MTC” to manufacture our intended equipment.
My question is whether 3.2 certification requirement is applicable for only raw material or for the whole equipment?
Inspection Test Plan is approved and it covers all stage wise inspections till final release by client appointed TPI.
After the satisfactory final inspection, Can TPI certify the finished equipment as 3.2? OR is he authorized to issue only Inspection Release Note? Please advise.
We have received the order from our client to supply Drilling (Wellhead) Equipment and the required certification is 3.2 and third party inspection (TPI: client appointed).
But, our supplier/manufacturer is saying that they will use the “off the shelf raw material with EN 10204 3.1 Mill MTC” to manufacture our intended equipment.
My question is whether 3.2 certification requirement is applicable for only raw material or for the whole equipment?
Inspection Test Plan is approved and it covers all stage wise inspections till final release by client appointed TPI.
After the satisfactory final inspection, Can TPI certify the finished equipment as 3.2? OR is he authorized to issue only Inspection Release Note? Please advise.