Optimum span length
Optimum span length
(OP)
Good day all.
We are doing a very preliminary concept design of a 50 m long bridge. We are considering a two-span option, and a three-span option.
I am wondering if anyone can provide reference to equations that relate cost of bridges to span length for steel girders and concrete girders. I understand that there are lots of variable to consider. But just for preliminary estimate, I am looking for cost (C) as a function of span length (L). If you know any such equations, kindly share.
Thank you
We are doing a very preliminary concept design of a 50 m long bridge. We are considering a two-span option, and a three-span option.
I am wondering if anyone can provide reference to equations that relate cost of bridges to span length for steel girders and concrete girders. I understand that there are lots of variable to consider. But just for preliminary estimate, I am looking for cost (C) as a function of span length (L). If you know any such equations, kindly share.
Thank you
RE: Optimum span length
If it's over a deep canyon, with plenty of freeboard, where piers would have to be fairly massive, single span may be the most economical choice.
If it's over a roadway, or railroad, where the depth of the superstructure is fairly limited, most likely a 3 span bridge is going to be the preferred option. Multiple span bridges with continuous concrete girders is not a straightforward design. If both steel and concrete are available options, generally steel girders would be preferred.
Where I'm at, we don't find many places where a 2 span bridge is feasible. Usually having a pier in the middle of a stream gets a flat no from the maintenance crew.
For steel girders, we find a depth to span ratio between 0.04 and 0.045 to be the most economical, with the 0.04 being the best for composite girders, and the 0.045 being better for non-composite. That being said, we've done composite steel girders with a depth to span ratio of 0.032 without adding significantly to the steel weight. If it's a choice between a shallow girder and cumbersome or expensive grade raise, the overall less expensive option may be the shallow girder.
Some of the deeper prestressed bulb tee sections are suitable for a 50m (or 60m) simple span. They're heavy, and therefore expensive to transport, so to be competitive, there would need to be a plant that cast them somewhere in the region.
RE: Optimum span length
I agree with the points you mentioned.
This bridge is over a river whose water level fluctuates due to the presence an upstream dam, and it freezes in winter. So, freeboard (consequently, shallow superstructure depth) is an important parameter. But at the same time, construction of two piers in the stream is discouraged from river flow / ice jam / river bed disturbance considerations. A big single span arch bridge with large freeboard is also out of question from cost perspective. It seems, one pier in the middle of the river is unavoidable.
RE: Optimum span length
RE: Optimum span length
It may be possible to provide enough counterweight in the abutment itself, or with concrete infill between the girders. Our preferred method to mitigate uplift is with steel H-piles embedded inside of a drilled shaft, to increase the skin friction area and coefficient of friction. Typically, the top 3m under the abutment would be ungrouted, to allow for thermal translation of the fully integral abutment.
At a span ratio of about 2.35:1 (11.5m-27m-11.5m), we can typically eliminate the uplift during construction, and find the final uplift to be minimal.
On the other end, we've gone as high as a 4:1 span ratio, but the uplift is fairly large, requiring a fairly extensive combination of measures to mitigate it.
RE: Optimum span length
RE: Optimum span length
I was talking about continuous steel girder spans. Highway bridges are rarely done as a series of simple spans, anymore. It requires joints in the deck over the piers, which pretty much always leak and damage the bearings and piers. Continuous decks with integral abutments move the expansion joints off the bridge, so that when they fail and leak, it doesn't result in damage to the superstructure. We take it one step further, and attach the approach slabs to the abutment, moving the expansion joint to a sleeper slab at the roadway end of the approach slab.
I said (or meant to convey) that making prestressed concrete girders continuous for live load requires a more involved design process, and a significant amount of extra care and attention to proper construction, to function properly.
Continuous steel girders are very common, and straightforward to design and construct.
RE: Optimum span length
RE: Optimum span length
This can be minimized by allowing the concrete to cure longer before transfer (releasing of the prestressing strands from the anchors, transferring the force to the concrete), but the precasters are typically an impatient lot, and don't like to wait that long.
RE: Optimum span length
Ever been to Texas?
RE: Optimum span length
My 10-30-10 was approximate questimate (something like!) at a balance between a cantilever and an end span. Better to use your 11.5 - 27 - 11.5 if it balances fully with moving loads so no uplift on the end abutments.
RE: Optimum span length
RE: Optimum span length
The link slab adds some very minor degree of continuity to the girders, but this effect is usually ignored. The link slab is usually only designed as a tension member to sustain the imposed deformation due to the rotation of the girders, and to remain serviceable to avoid the water ingress issue.
RE: Optimum span length
RE: Optimum span length
And over salt water marsh and freshwater swamps in coastal regions.
RE: Optimum span length
We've rehabbed some bridges that had double-bearing piers and deck joints, and replaced portions of the deck to with link slabs, to eliminate the joints. As far as I know, all of those have been fairly recent, so we have yet to see how they hold up.
RE: Optimum span length
https://www.google.com.au/search?q=chesapeake+bay+...
RE: Optimum span length
I was not trying to make broad statements encompassing the whole of bridge design everywhere. I didn't think I needed to qualify my statements, assuming that my comments would be taken in the context of the bridges of the length the OP inquired about. Apparently, I should have, in order to avoid this rabbit trail.
RE: Optimum span length
In Ontario, jointless bridges are preferred (at the priers and also at the abutments).
End span to interior span ratio is preferred to be 0.75 for medium span steel bridges, as this proportion is expected to result in positive dead load moments being approximately equal in all spans. Possibly, the same holds true for concrete bridges.
RE: Optimum span length
It generally holds true for 3 span continuous bridges. For multiple simple span bridges, especially concrete one, having the spans the same length is usually the most economical. The simple for dead load, continuous for live load (girders made continuous after erection) is usually the same, just due to the economy of scale (same girders for all spans, with only minor differences in strand arrangements.
For shorter 3 span steel girder bridges, though, we sometimes find it more efficient to push the span ratio to around 0.6 (or 1.67 for center/end ratio, the way we refer to span ratio), allowing us to have only 2 field splices (around the 2/10 and 8/10 points of the center span).
RE: Optimum span length
Interesting. I think these comments are regionally motivated or influenced. Simple span made continuous for live load is a bread and butter preferred structure type for highway bridges in my market. The design tasks aren't too hard either, anyone capable of designing a steel bridge can easily handle the details and calcs for simple made continuous concrete spans; there are a few interesting calcs to do but it's primarily a detailing exercise. Steel is hardly ever economical in our region, especially with a relatively short bridge like this.
- The 0.7-0.85 end span to internal span ratio in 3 span structures is always a decent starting point.
- 50m is well within precast girder simple span feasibility depending on structure depth but local shipping length & weight limits would need considered.
- Short end spans in continuous structures can result in uplift at the bearings which needs considered
- Simple spans resulting in joints at the piers should definitely be avoided
RE: Optimum span length
Interesting. Maybe it's a matter of familiarity and experience. I find the design effort considerably more for prestressed concrete superstructures, and we don't even do the actual design of the prestressing. Steel girders are our bread and butter, so I find them easy. Our biggest difficulty with prestressed girders is handling the camber, especially on the decked bulb tees.
RE: Optimum span length
Texas builds quite a few simple span bridges with prestressed concrete girders as does Oklahoma. Best I can tell, TXDOT does not like continuous for live load designs or link slabs. Oklahoma doesn't really like continuous for live load either, but does use link slabs.
I have also designed a simple span plate girder up to 200' in length as well. I wouldn't recommend doing that a lot, but that was what the client wanted to do.
RE: Optimum span length
OSU - out of curiosity, why the objection to live load continuity? is it a settlement concern? Back in the 80's I worked on a multibridge NJDOT project. They wanted simple spans - their philosophy: simple bridges, simple problems; continuous bridges, continuous problems - however, since it was Federally funded FHWA insisted on continuity. Since the Feds were writing the check, they won.
Link slabs have become very popular in NY for bridge rehab projects. Most of the multispan bridges built in NY during the late 50's to early 70's were mostly simple spans.
RE: Optimum span length
RE: Optimum span length
RE: Optimum span length
RE: Optimum span length
This explains the TXDOT philosophy https://texashistory.unt.edu/ark:/67531/metapth637... They love their precast deck panels and that could cause problems with negative moment over the piers. They also say any perceived savings in structure cost or structure depth has never been realized.
For quite a while ODOT was focused on building the most economical prestressed concrete bridge possible, hence mostly simple spans. They do use a lot of link slabs and integral abutments.
This article from Modern Steel makes the case that simple span with link slabs may be cheaper than continuous girders. https://www.aisc.org/globalassets/modern-steel/arc...
RE: Optimum span length
In some situations, particularly where construction time is short, span by span construction with prefabricated superstructure elements can be the preferred option. We aren't usually in that much of a time crunch for our bridges.
We do alot of staged construction (build half of the new bridge next to the existing, demo the old, and build the other half), where detours would be difficult or expensive.
RE: Optimum span length