INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Contact US

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

API 610 Pump - How to choose between Overhung and Between Bearings

API 610 Pump - How to choose between Overhung and Between Bearings

API 610 Pump - How to choose between Overhung and Between Bearings

(OP)
Hello everyone,
I am designing some API 610 Pumps for off-shore use.
I have a doubt when to use overhungs pumps or between bearings pumps
I know that I have to use between bearings for high flows, but how high?

Can you help me, please?

RE: API 610 Pump - How to choose between Overhung and Between Bearings

Ask your vendors.

BB are usually multi stage major pumps of probably 250kW or more and high pressure high flow units.

Each vendor will have different model ranges which have different ranges of flow and pressure.

Remember - More details = better answers
Also: If you get a response it's polite to respond to it.

RE: API 610 Pump - How to choose between Overhung and Between Bearings

I would request proposals from a couple of different manufacturers. They may be incentivized to offer overhung options in order to be the low cost bid. I might go back and request proposals for between bearing double suction based on the NPSH margin (< 5 feet), Suction Specific Speed (>13,000) or Suction Energy (>240 x 106). A large, low rpm, between bearings pump would improve all three of those parameters. Then I would balance the higher installation cost and higher energy costs against better reliability and availability.

Johnny Pellin

RE: API 610 Pump - How to choose between Overhung and Between Bearings

Low maintenance is nice when offshore.
Otherwise you don't give much information to decide between them.
Do you have a specific application in mind, or are you trying to frame a general rule of thumb?

RE: API 610 Pump - How to choose between Overhung and Between Bearings

What does your company guideline for selecting off-shore pumps tell you ?

You, know .... the one that your company developed at its own expense to guide newbie engineers like yourself...

I am sure that you do not have to rely upon tribal knowledge or vague memories of things "that an older engineer once told me years ago"

What ???... !!! No in-house guideline ? .... Are you relying on old CHEVRON or EXXON guides that you found on the internet

More details please ....

There are many other choices to be made when specifying pumps

What is your pumped liquid, Design temperatures and Pressures etc....????

MJCronin
Sr. Process Engineer

RE: API 610 Pump - How to choose between Overhung and Between Bearings

(OP)
I'm trying to do a general rule and maybe a general spreedsheet

RE: API 610 Pump - How to choose between Overhung and Between Bearings

Bearing configuration is selected by the pump designer to limit the effects of deflection and critical speed of the shaft and impeller. As the details of that subject are well above my pay grade, these links will better explain what you need to know than can I. Bearings on both ends of the shaft are far superior to controlling maximum deflection on the longer shaft pumps and that configuration must be selected when deflections of an overhanging impeller are too large, which might cause impeller contact with the casing.

https://roymech.org/Useful_Tables/Drive/Shaft_Crit...

http://sandv.com/downloads/0505swan.pdf


RE: API 610 Pump - How to choose between Overhung and Between Bearings

It's horses for courses, what flowrates and heads are required, 10 gpm at 50 ft or 1000gpm 250ft. There is no rule of thumb, it's always (or should be) a considered engineering review,

It is a capital mistake to theorise before one has data. Insensibly one begins to twist facts to suit theories, instead of theories to suit facts. (Sherlock Holmes - A Scandal in Bohemia.)

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login


Resources

Low-Volume Rapid Injection Molding With 3D Printed Molds
Learn methods and guidelines for using stereolithography (SLA) 3D printed molds in the injection molding process to lower costs and lead time. Discover how this hybrid manufacturing process enables on-demand mold fabrication to quickly produce small batches of thermoplastic parts. Download Now
Design for Additive Manufacturing (DfAM)
Examine how the principles of DfAM upend many of the long-standing rules around manufacturability - allowing engineers and designers to place a part’s function at the center of their design considerations. Download Now
Taking Control of Engineering Documents
This ebook covers tips for creating and managing workflows, security best practices and protection of intellectual property, Cloud vs. on-premise software solutions, CAD file management, compliance, and more. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close