INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Concrete Shear/Bearing at Pile-to-Slab Interface

Concrete Shear/Bearing at Pile-to-Slab Interface

Concrete Shear/Bearing at Pile-to-Slab Interface

(OP)
We are designing a pile supported slab that supports a building structure. The columns from the building sit directly above where the piles are with a 12" slab between to two elements.

In timber design, for shear, you can ignore loads placed within "d" of the support, where "d" is the depth of your beam.

Is there a similar provision in concrete design (ACI)? To me, it feels like direct bearing between the column base plate and pile below. By doing this, it would allow us to skip stirrups in this area (30% of load at pile is from building, 70% from self weight of slab and slab live load).

Thanks

RE: Concrete Shear/Bearing at Pile-to-Slab Interface

Yes, there is a similar provision in concrete. Probably more so than in wood really.

What are the dimensions of your base plates?

What's the diameter of your piles?

HELP! I'd like your help with a thread that I was forced to move to the business issues section where it will surely be seen by next to nobody that matters to me: http://www.eng-tips.com/viewthread.cfm?qid=456235

RE: Concrete Shear/Bearing at Pile-to-Slab Interface

I would sure consider thickening the mat locally at each pile head. Avoids the stirrups, as you were trying to do, and also provides easy, definite punching shear resistance for that High slab load bearing on the skinny Pile.

I agree about the column load being so close to the pile. Check bearing (easy), Make sure any complications due to pile installation tolerance will not cause problems.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login


Resources


Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close