INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

END RELEASES IN ETABS QUESTION
4

END RELEASES IN ETABS QUESTION

END RELEASES IN ETABS QUESTION

(OP)
HELLO EVERYONE. I WOULD TO HEAR YOUR IDEAS ABOUT THE USE OF "END RELEASES" IN ETABS.

1 - WHEN IS IT ALLOWED TO BE APPLIED IN BEAMS AND COLUMNS?
2 - AREN'T THE CONCRETE BEAMS AND COLUMNS SUPPORT SHOULD ALWAYS BE FIXED?
3 - CAN SOMEBODY TELL ME THE PURPOSE WHY WE SHOULD PUT END RELEASES?

THANK YOU VERY MUCH. =)

RE: END RELEASES IN ETABS QUESTION

1) when the user want to change the support condition of frame element (column or beam).
2) Support condition depend on the designer design intention. There are some cases where support condition for column/beam need to be pin instead of fix. Example such as steel column connect to RC column where it is more economically to design as pin-pin connection.
3) Same as 2).

Hope this help.

Willie

RE: END RELEASES IN ETABS QUESTION

(OP)
Thank you for your kind respond. I so appreciate it. =)

1 - Is it even allowed to change the support condition of concrete frame element from fixed to pin?
2 - I saw some designers applying end releases on edges of concrete beams & columns if it is not a cantilever, is that allowed? This will eliminate the moment transferred from the beam to column. Isn't that dangerous, neglecting the moment transferred to the column from the beam?

Thanks. =)

RE: END RELEASES IN ETABS QUESTION

Hi,

It is allowed to change the support condition even for concrete frame element.
However, the designer need to ensure the changes are reasonable and justifiable.
The designer need to ensure the oversll structutal stabiliy will not be affected.

For structural where there is not core wall, beam to column connection need to be fix to creste s moment frame effect for stability.

If core wall exist, there is a posibility to pin the beam to column connection and relying purely on corewall to achieve the structural stability.


I have listed two examples below of pin condition for your thought:

1) Secondary Rc beam to main RC beam connection
The connection of secondary beam to main beam can be pin-pin in view that RC beam will normally not designed to take torsion. If fix fix would be apply, your main beam to design for torsion and your provided shear link need to be loop link to resist the torsion effect.

2) RC beam to RC wall connection
Normally RC wall is week in minor axis. If RC beam would be connected to minor axis of RC wall, the connection need to be pin where the moment will not transfer to RC wall minot axis.


Hope this can clear your doubt.

RE: END RELEASES IN ETABS QUESTION

(OP)
Thank you very much...

If I understood it right, fixed support for concrete frame element can be replaced with pin connection to eliminate torsion in case of secondary to main beam, and so that there would be no moment transferred to core wall if it is applied on the weak axis..

If we made the concrete frame connections pinned in the analysis, shouldn't we also make it pinned in actual construction? I would like to know how is it done on cast in place concrete construction. For all I know in actual, it should be a fixed connection. This is really what bothers me most. =(

Thanks. =)

RE: END RELEASES IN ETABS QUESTION

Also, when you "release"secondary beams, please make sure you pay attention to the detailing. Full Ld should not be provided.

RE: END RELEASES IN ETABS QUESTION

(OP)
brick2011,

oh. . I see.. Does that mean if I don't provide full Ld on my concrete beam supports, no moments will be transferred to the adjacent frames because it will behave as simply supported? In that case, If we want a fixed support we provide full Ld, For simple support don't provide full Ld. Therefore, Moment reactions are just a matter of Ld provision. Is that it? I wish to hear more from you...

Thank you very much. =)

RE: END RELEASES IN ETABS QUESTION

I never meant to say moment is just a function of Ld... detail the secondary and primary beam connection accordingly.

engineering is in the details..


RE: END RELEASES IN ETABS QUESTION

It is very important to create the correct detailing, because if you got seismic load it is recommended to accomplish certain flexibility to dump some energy, sometimes you can do this by placing the rebar in crossed position on the beam column connection (see the attached picture).

MSc. Eng. Serguei Joa
Tel: +5352460358
mail: sm.joa@bouygues.cu

RE: END RELEASES IN ETABS QUESTION

there are cases for the joint condition, if you dont wish to transfer moment from beam to column (shear walls and frame elements take moment and seismic load) , depending on the structural system desired.
then you should release moment at beams and columns.

RE: END RELEASES IN ETABS QUESTION

(OP)
Can u show me how joint reinforcement detailing is done for released and unreleased moment?

Thanks. =)

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login


Resources

White Paper - Reliability Verification for AI and ML Processors
Artificial intelligence and machine learning are seeing growing adoption in a wide range of applications. ICs used for AI/ML applications are characterized by large parallel processing computation units, high power dissipation, and complex circuitry that can deliver maximum performance within a strict power budget. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close