Construction of a reinforced earth bund
Construction of a reinforced earth bund
(OP)
I've designed a 3.50m high reinforced earth accoustic bund, it's got 45 degree slopes and a 1m wide strip along the top. The contractors on site are wondering how to place and compact the soil now it's about 2m high. For H&S reasons they are reluctant to ave any plant running along it (one false move and it would be rolling down the side). There are also concerns about personnel being on top of it. This will obviously become more onerous the high (and narrower) it becomes.
Has anyone got any practical experience of constructing these things? I know they are commonly built, I've seen many of them that have been finished. The contractor has never built one before and needs some advice.
Thanks
Has anyone got any practical experience of constructing these things? I know they are commonly built, I've seen many of them that have been finished. The contractor has never built one before and needs some advice.
Thanks
RE: Construction of a reinforced earth bund
RE: Construction of a reinforced earth bund
RE: Construction of a reinforced earth bund
RE: Construction of a reinforced earth bund
RE: Construction of a reinforced earth bund
RE: Construction of a reinforced earth bund
RE: Construction of a reinforced earth bund
thinner layer thicknesses may make the use of handheld compaction plant (whacker plate type) feasible dependant upon the fill material. as others have pointed out, its a pretty basic observation to have made when bidding the work, presuming hes not working to client or designer provided methodology he needs to be coming to you with solutions to his problems
RE: Construction of a reinforced earth bund
RE: Construction of a reinforced earth bund
cant see anyway round handheld plant for compaction. a hydraulic plate on the end of a long reach might be an option but how accessible that plant would be to obtain I cant say.
make sure you get a good risk assessment if people are required to work atop the slope, operators safety and also those down slope from operators work area would be of concern