cntrleng
Aerospace
- Feb 25, 2004
- 4
Per AWS D1.1 GMAW is considered a prequalified process when considering the use of a prequalified WPS (written of course) but is Pulsed Mig considered to be a prequalified process or just straight short citcuit CV MIG?