jwac50
Industrial
- May 25, 2007
- 3
need to repair saltwater dock's wood pilings. plan on using pvc pipe to encase existing wood pilings that is 6 inches larger diameter than existing wood pile. place steel reinforcement rings attached to vertical steel inside pvc pipe. then fill with concrete (piles are exposed at low tide so will fill pipe at low tide. piles are 12 feet above mud line. piles support walking deck 6 feet high and have about 60 percent of cross section remaining. any suggestions?