Hi All,
Attached a sketch, where the outer LVL has to be flushed with studs beneath it, so can't have a king stud.
In this scenario does the outer (2)-LVL is to be screwed to the perpendicular (3)-LVL to avoid rotation of (3)-LVL?, but the joists are also tied to it which might help to resist any rotation of that beam.
Also is there any major wrong with this type of connection?
Please suggest if anything has to be looked out here.
Thank you very much