THANKS TO ALL FOR YOUR RESPONSES/ADVICE/INFORMATION. PERSONALLY, I TRY TO UTILIZE ENGINEERED CONNECTORS (AS PER USSURI) WHENEVER POSSIBLE WHETHER IT BE FOR WOOD, CONCRETE, METAL STUD, ETC. IN THIS CASE, I WAS SPECIFICALLY REQUESTED BY THE GC TO LOOK AT WIRE ROPE. I USED TO WORK FOR A PRECAST/PRESTRESSED MANUFACTURER AND, AS MENTIONED BY EPR, WE USED PIECES OF PRE-STRESSED STRAND AS LIFTING INSERTS. THIS WAS ALWAYS DONE AS A "WE'VE DONE IT THIS WAY FOR YEARS AND HAVE NEVER HAD ANY PROBLEMS WITH IT" AND IT WAS IN THE COMPANY ENGINEERING MANUAL AS A "DO IT THIS WAY" METHOD WITH NO CALCULATIONS AS BACKUP (BUT MANY YEARS OF "TESTING"). WITHOUT ANY EXPERIENCE WITH WIRE ROPE, I WAS NOT SURE IF THE EMBEDMENT/DEVELOPMENT REQUIREMENTS WOULD BE EXACTLY THE SAME AS PRE-STRESSING STRAND. REGARDLESS, AFTER POSTING THE INITIAL REQUEST IN THIS THREAD AND DOING SOME RESEARCH (THANK YOU MICHST), I NOTIFIED THE GC THAT I DID NOT HAVE THE ABILITY TO PROPERLY ANALYZE THE SITUATION AS HE REQUESTED IT AND THAT HE WOULD NEED TO MODIFY HIS REQUEST TO INCLUDE OTHER INSERTS, METHODS OF PICKING, ETC. OR HE WOULD NEED TO FIND ANOTHER ENGINEER WITH WIRE ROPE EXPERIENCE. HAVE NOT HEARD BACK FROM HIM IN SEVERAL DAYS SO I GUESS THE ISSUE IS DEAD (AT LEAST FOR ME). AGAIN, I THANK EVERYONE FOR THEIR INPUT.