hocs
Civil/Environmental
- Jul 12, 2007
- 1
Can anyone tell me about any difference between 1m width sand backfilling behind the basement wall or 2m sand behind the same wall. what i mean is in term of earth lateral pressure. please note that there is no provision of subsoil pipe at the toe of the wall.