JennyNakamura
Structural
- Apr 8, 2011
- 68
Hi everyone,
When cofferdams or some other kind of stream flow diversion is required for bridge foundation retrofitting, are they designed by the engineer of record and shown on the contract drawings or are they designed by the Contractor (or his specialty engineer) like would be the case with scaffolding or falsework?
Thanks in advance...
When cofferdams or some other kind of stream flow diversion is required for bridge foundation retrofitting, are they designed by the engineer of record and shown on the contract drawings or are they designed by the Contractor (or his specialty engineer) like would be the case with scaffolding or falsework?