Where do you guys typically draw the line on using a pedestal or not? Is it based off of footing size? Load? Frost depth? Do you use it for nearly any exterior condition?
Where do you guys typically draw the line on using a pedestal or not? Is it based off of footing size? Load? Frost depth? Do you use it for nearly any exterior condition?
Usually depends on if I think it's cost effective. If I have to upgrade my concrete PSI too much, add a ton of rebar, require specialty fill/compaction or flare the column I'll usually tell them to just pour a monolith. I work mostly residential so there special column shapes, rebar over stronger than #5(G40), concrete over 3000 PSI or arduous compaction/fill requirements the contractors either don't have the tools or experience to deal with it.