carnahanad
Structural
- Feb 4, 2010
- 44
Hello,
I'm a structural engineer and two electrical engineers showed me a detail of their generator pad that had a note that read something like, "...95% proctor test or 55psi PBV." Can anyone tell me what PBV means?
I'm a structural engineer and two electrical engineers showed me a detail of their generator pad that had a note that read something like, "...95% proctor test or 55psi PBV." Can anyone tell me what PBV means?