I assume you are producing such plans as an consulting engineer on a project.
Practices vary around the world. In the North America (and the US specifically) the EoR produces a PT design drawing that shows high and low points, forces, and a general layout, then the PT supplier will produce PT shop drawings that meet that design. In other parts of the world the consulting engineer will detail the PT fully - number and spacing of tendons, rebar T and B, sometimes formwork profiles too.
Where are you practicing and what do your colleagues do?