Hi guys,
Thanks for the infos.
Leonardt,
Actually we are an offshore topsides engineering design company. Most of our design scope is just the facilities of the topsides, i.e. processing facilities like wellhead control panel with the wellhead control philosophy, the production manifolds, and the utilities like fuel gas system, produced water system etc, etc. The christmas tree SOW is not falls under design consultant, it falls under the christmas tree vendor working closely with the client. The client only tells us how many wellhead they want in the platforms and what kind of safety valves that the wellheads have - which is based on their findings with the wellhead vendor. For us we just set the control philosophy of the wellhead valves closure like during ESD or PSD or even USD. The details of the wellhead or how the depth of the casing or whatever you call it most of the time we do not know because personally I think its a specialist subject which people with petroleum engineering or reservoir people can answer best. And because I have that curiosity, I joined this petroleum group to ask more about this well killing operations that who knows one day when I became a senior and there is a curious young engineer ask me about this... and for sure you guys will be credited. Anyway thanks for the link leonardt.
Any way thanks again.
Rgds,
Reiszal