Eng-Tips is the largest forum for Engineering Professionals on the Internet.

Members share and learn making Eng-Tips Forums the best source of engineering information on the Internet!

  • Congratulations dmapguru on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Unloading a low pressure oil well

Status
Not open for further replies.

YEngineer

Petroleum
Joined
Mar 6, 2007
Messages
18
Location
CA
At the end of an acid job, I might end up with about 200m of fluid column in tubing.
The well is 2900m TVD, there is a tubing extension joint on the way and tubing cannot be swabbed passed this point.
I have only some approximate reservoir pressure data and I am afraid that at the end of the job, the well might not be able to flow on its own. If this is the case, I am planning to use coil and N2 to unload the well.
Now, if the coil guys go too fast and with a lot more N2 as optimal, the friction losses in coil/tubing microannulus would be higher than reservoir pressure and I might end up pushing the fluid back into formation, instead of bringing it to surface.

Is there a rule of thumb, or any way how to calculate optimal N2 rate for unloading the well, without having to model it in Olga.
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor

Back
Top