Tek-Tips is the largest IT community on the Internet today!

Members share and learn making Tek-Tips Forums the best source of peer-reviewed technical information on the Internet!

  • Congratulations TugboatEng on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Welding of already fabricated beam connection angles that were intended to be bolted

Status
Not open for further replies.

jechols

Structural
Joined
Jan 21, 2004
Messages
109
Location
US
I have a project where beam to column web connection angle have been fabricated (bolted-bolted) but are on 4" C/C and will be impossible to install. Is it acceptable to change to bolted-welded using the already fabricated angles that have holes in both legs. The angles will be shop welded to the beam and field bolted to column webs. Trying to avoid fabricating new angles with solid leg and if already fabricated angles can be used, want to avoid field welding or adding field bolts in the open holes.
 
Sounds ok to me. Just be aware of the reduced area in your angles (i.e. its impact on capacity; the weld strength (or prying) will probably wind up controlling anyway).

 
Thanks WARose, Just discovered other issue so the angles will all have to be refabricated anyway.
 