Dear all, as expected i have found some good discussion & quick response over the thread in this forum, thanks!
bimr: I understands the concern raised by you, however, it seems that its because i have not explained the issue completely. Please excuse me for that. Moreover, the references to threads & paper provided by you are helpful & improves practical understanding in this case. Could you please add any more referring to the below provided information.
LittleInch: The problem starts at emergency & short duration of run.
![[smile] [smile] [smile]](/data/assets/smilies/smile.gif)
Please refer below info.
As per AWWA-C205 water velocity should be maintained in normal ranges
(not specified) for best performance of lining. It also states that velocity
above 6.1 m/s (20 ft/s) will require special study
(to understand the lining performance).
In our case, we are constructing redundant pipeline(CS with cement lining) to the existing GRP pipelines(#2) for the short distance (less than 2 km), where failure in GRP line were experienced in the past. During normal operation velocity are within the range of 3-4.5 m/s. When both GRP lines fails, the new designed CS pipeline should be capable for the complete flow (total flow in #2 GRP pipelines). However, this is considered as emergency situation & for short duration. With above consideration, we would like to have pipeline (65 inch) velocity
at or below 6m/s in emergency case. We have evaluated that frictional losses, cavitation & surge pressure are within the design limit because of this high velocity by performing steady & transient hydraulic analysis.
However, we have more concerns about performance of cement lining considering erosion and damage at this emergency situation.
In this concern, client wants to understand/quantify for how much short duration (specifically like in days) he can run the system without any damage to cement lining.
We have communicated with AWWA technical committee, to understand if this velocity limit (6.1 m/s) is based on some practical experiments or on field experience. However, it looks that it is based on some other reference standard.
Thus, i am looking at, if the above design consideration is unusual or still there are water systems that are designed or run at water pipeline velocity as high as 6 m/s. From where, i can get idea/information about allowable duration of the run.
I hope the problem is more clear now.
Thanks, Subodh.