freelander
Geotechnical
- Jan 5, 2005
- 8
The spec for highway works in the UK specifies a Gv of 3% for material with lime and/or hydraulic binder. Anyone know why it is set at 3%? I am doing some research on this test and find it hard to meet this criteria with the soils I am testing. They very rarely have a volumetric heave below 3% even though the CBR heave and strength is ok. Any thoughts??